Structural Steel Works
Pi designs, supplies and installs structural steel for a various of projects in Hong Kong, including building and civil projects.
PROJECT
BLAST DOOR, TRUNK ROAD T2 EASTBOUND TUNNEL, CHA KWO LING
Client: Bouygues Travaux Publics
Schedule: May 2020 – June 2020
Install a Temporary Noise and Dust Enclosure for Blasting Works at Eastbound Tunnel of Trunk Road T2 in Cha Kwo Ling
Previous
Next
CROSS ADIT LINING SHUTTER, TSEUNG KWAN O – LAM TIN TUNNEL, CHA KWO LING
Client: Leighton – China State Joint Venture
Schedule: November 2019 – December 2019
Design, Fabricate and Deliver two sets of formwork for collar passage junction between type 21, 22 cross passage and main tunnel of Tseung Kwan O – Lam Tin Tunnel Main Tunnel