BLAST DOOR, TRUNK ROAD T2 EASTBOUND TUNNEL, CHA KWO LING

BLAST DOOR, TUNNEL S02 OF TSEUNG KWAN O – LAM TIN TUNNEL, CHA KWO LING

CROSS ADIT LINING SHUTTER, TSEUNG KWAN O – LAM TIN TUNNEL, CHA KWO LING

BLAST DOOR, TRUNK ROAD T2 EASTBOUND TUNNEL, CHA KWO LING

Client: Bouygues Travaux Publics

Schedule: May 2020 – June 2020

Install a Temporary Noise and Dust Enclosure for Blasting Works at Eastbound Tunnel of Trunk Road T2 in Cha Kwo Ling

BLAST DOOR, TUNNEL S02 OF TSEUNG KWAN O – LAM TIN TUNNEL, CHA KWO LING

Client: Leighton – China State Joint Venture

Schedule: January 2020 – March 2020

Supply and Install a temporary Noise & Dust Enclosure for blasting works of tunnel S02 of Tseung Kwan O – Lam Tin Tunnel

CROSS ADIT LINING SHUTTER, TSEUNG KWAN O – LAM TIN TUNNEL, CHA KWO LING

Client: Leighton – China State Joint Venture

Schedule: November 2019 – December 2019

Design, Fabricate and Deliver two sets of formwork for collar passage junction between type 21, 22 cross passage and main tunnel of Tseung Kwan O – Lam Tin Tunnel Main Tunnel